10 Day Schedule

Projects
Employees
+
Contractors
+
bathroom demolition

Preparation and Demolition

Cover the floors and rooms with drop sheets and plastic Disconnect plumbing and electrical elements in the bathroom Remove fixtures like toilet, vanity, shower or tub. Remove the old wall and floor tile, drywall, bulk head Haul away debris and clean the site for trades to start fresh.

shower curb and niche framing

Framing and Carpentry

Repair and adjust wall studs, floor joists, or subfloor if needed. Frame in new shower curb, tub surround, niche or shower bench areas Ensure layout matches the new bathroom design.

plumbing rough in

Plumbing Rough-in and Drain work

Install or reroute supply and drain lines for sinks, toilet, shower, tub. Set up shower valves (rough ins) and bathtub drains for the new project, adjust water supply to a new vanity Pressure test for leaks before closing walls.

electrical work in a bathroom

Electrical Work

Run wiring for lighting , potlights ,exhaust fan and outlets (including GFCI). Install boxes for vanity lights and switches. Install a dimmer and fan timer Inspect all wiring before drywall.

drywall work priming and painting

Drywall Finishing & Priming

Apply tape and first coat of mud on seams and screws.Apply second and third coats of mud, sanding between coats. Smooth surfaces for painting and tiling. Apply drywall primer to sealed areas.

shower waterproofing with schluter and tile installation

Waterproofing & Tiling (Walls & Floors)

Waterproof shower walls and floor underlayment with Schulter System or Prova System Start tiling shower floor and walls. Install floor tiles. Allow adhesive to cure overnight.

fixtures installation , grouting

Grouting & Fixtures

Grout wall and floor tiles. Install bathtub (if not freestanding), toilet flange, and shower base/door if not custom. Seal grout lines.

custom shower glass enclosure

Vanities, Cabinets and Fixtures

Install vanity, countertop, sink, and faucets. Mount mirrors, cabinets, and shelving. Install lighting fixtures and exhaust fan. Connect all plumbing and electrical.Install toilet, trim, and accessories (towel bars, hardware). Caulk around tub, shower, and sink. Deep clean entire bathroom. Final inspection and walkthrough with homeowner.

RENOVATE YOUR LIFESTYLE

10
YEARS IN lOcal BUSINESS

At Any Bathroom Inc. we are proud to offer top-quality bathroom renovation and remodeling services across Mississauga. Whether you’re looking to upgrade your current space with modern fixtures, create a spa-like retreat, or completely transform your bathroom layout, our team of experienced professionals is here to make your vision a reality.

Our expert services are available to homeowners in the following neighborhoods across Mississauga:

  • City Centre
  • Port Credit
  • Sheridan
  • Meadowvale
  • Cooksville
  • Applewood
  • Clarkson
  • Erindale
  • Lorne Park
  • Streetsville
  • Dixie
  • South Mississauga (South of the QEW)
  • Hurontario
  • Central Erin Mills
  • Brampton Border Area
  • Fairview
  • West Erin Mills

Whether you live in a high-rise condo in City Centre, a lakeside home in Port Credit, or a suburban property in Meadowvale, we have the expertise to cater to your unique needs. From design consultation and material selection to professional installation and finishing touches, we ensure every project is completed to the highest standards of quality and craftsmanship.

No matter where you are in Mississauga, we’re here to help you create a bathroom that reflects your personal style and meets your functional needs. Contact us today for a consultation!


Bathroom renovation scheduling in Mississauga

A 10-day bathroom renovation schedule—when the project qualifies.

Some bathroom renovations may qualify for this schedule. We confirm whether it fits after the final scope, selections, required approvals and site conditions are understood.

Bathroom specialists for Mississauga homeowners
Schedule confirmed against the final scope
Clear planning before construction begins
Five-year workmanship warranty
A coordinated sequence

What the schedule can include

The work is organized as a connected sequence: protect the home, prepare the room, complete the behind-the-wall work, finish the surfaces and install the selected fixtures. Details vary by bathroom and final scope.

01

Preparation & demolition

Protect adjacent areas, disconnect relevant items, remove existing fixtures and finishes, then clear the site for the next trades.

02

Framing & carpentry

Repair or adjust framing and subfloor where needed, then shape the new layout, shower curb, surround, niche or bench areas.

03

Rough-ins & drainage

Install or reroute supply and drain lines as required for the planned sink, toilet, shower or tub, then test before walls are closed.

04

Electrical work

Coordinate lighting, fan, outlet and switch locations with the final bathroom layout before drywall is finished.

05

Drywall & priming

Finish repaired wall areas and prime the surfaces that are ready for paint or tile.

06

Waterproofing & tile

Prepare shower surfaces and floor underlayment, then install the selected wall and floor tile as the assembly allows.

07

Grouting & shower details

Grout tiled areas and coordinate shower-base, door or tub details according to the final design and product requirements.

08

Vanity & finishing

Install the selected vanity, fixtures, lighting and accessories, then complete cleaning and a final walkthrough.

What can change timing

Confirm the schedule after the project is defined.

A realistic schedule begins with a complete scope and selected products. The final plan needs to account for the room, material choices and any requirements outside the work area.

  • Final layout, fixture and finish selections
  • Existing conditions found as finishes are removed
  • Custom components or products with their own requirements
  • Required approvals, access arrangements and site conditions
Project-specific feedback

A homeowner’s documented 10-day result

Guest room walk in shower

Tub-to-shower renovation

“On the 10th day, as he promised, he made us a bathroom exactly how we would want it.”

Meniely Legaspi · Tub to Shower reno

Find out whether your bathroom may qualify.

Start with the room, the work you want completed and the schedule considerations that matter to you.

Request a free estimate